top of page
Baha Bay Water Park
Phase 2
Location Nassau Bahamas
Scope Design and Build
Value USD 120 Million
Client CTF/BahaMar
Status Completed. 2021
BEG was engaged as Design/Build General Contractor. Scope included Design Development thru to IFC Drawings, permits, civil & earthworks, site MEP, sitewide utilities, underground vaults, plant & equipment rooms, Wi-Fi, Data & POS stations, security camera networks, restaurants, cabanas, facility & operational buildings, roadways, parking lots, entry building, open-air casino, water park rides (including Wave Pool, Flow-rider surf simulator, raft slides, lazy river), changerooms, restrooms, 15 different pools incl MEP systems & equipment, beach works, artificial rockwork, theming, cascade & grotto water features, kiosks, retail outlets, amenity buildings, hardscape, landscape, specimen tree/palm transplantation, site lighting, signage & irrigation, project wide testing/commissioning/handover.
bottom of page